The project covers a land area of 57200.1m2 and a total building area of 101625.0m2, including 79641.3m2 above ground and 21983.7m2 underground
The pilot building was built in 2014. The structural design, deepening design of components, component production, construction and hoisting are all carried out by the subordinates of the group.
The 2# pilot building was built in 2017. The whole process adopts BIM technology and realizes the chip traceability of each component .
The project is located in Songjiang District, Shanghai, and is construction part y is Shanghai Songjiang Minfeng Stamping parts Factory Co., LTD.
The project is located in Minhang District of Shanghai, and the construction party is Shanghai Xinzhuang Industrial Zone Industrial Co., LTD.
The project is located in Songjiang District, Shanghai, and is constructed by Shanghai Yitian Lubricating oil Co., LTD.