CN EN JP
Haiyan assembly plant
  1. The project is located in Haiyan, with a total construction area of 70000 square meters. The project is a two-story workshop.
  2. The system is an assembled integral frame structure with no less than 50% precast rate.
  3. Prefabricated components are mainly composed of prefabricated beams, prefabricated columns, prefabricated composite panels, prefabricated stairs and so on
Group official website
021-37652288
Copyright © 2020 Shanghai Citi-raise Construction Group Advanced Building Materials Co., Ltd. All Rights Reserved . Designed by Wanhu.