Longhu Maqiao
-
The commercial office project of Block 28A-02A of MHC10803 in Maqiao Town, Minhang District is located in Maqiao Town, Minhang District, Shanghai. The structural system of this project adopts two structural systems, namely, the assembled integral shear wall structure system and the assembled integral frame-in-situ shear wall structure system, with the overall prefabrication rate of the project up to 40%
-
Precast components are mainly composed of precast walls (edge components, general shear walls, maintenance components), precast columns, precast beams, precast composite panels, precast stairs.